• MOQ 1000pc · Lead time 10–14 weeks · Custom artwork included.

The layer the runner keeps long after the race.

Construction

The boring details that decide whether it lasts.

Fabric

Moisture-Wicking Performance Fabrics

Print

Heat Transfer, Sublimation, Screen Print, Embroidery

Fit

Athletic & Unisex Fits

Sizes

Youth to 5XL

MOQ

Starting from 1000 Pieces

Lead time

6–8 Weeks Production

Quality

Race-Tested Construction

Features

The details that earn a runner's loyalty.

Zip garage

Soft chin guard so the pull never bites the neck.

Brushed back

Holds warmth in the corral, vents once running.

Low-bulk collar

Sits flat under a bib number and a jacket.

Thumbhole option

Keeps the sleeve down and the hand covered.

Dye-sub graphics

No fade, no crack, no rough hand on the print.

Sponsor panels

Engineered into the cut, not patched on top.

Reflective option

Shoulder and cuff hits for the dark-morning runner.

Washfast 50×

Tested through fifty home-machine cycles.

Variations

Two teams, one base. Both built the same way.

Running club · 2024 · 2,800 units

Members quarter-zip, grey colorway

Marathon series · 2024 · 5,100 units

Pacer quarter-zip, navy colorway

Let's make something worth keeping.

view