• MOQ 1000pc
  • Lead time 10–14 weeks
  • Custom artwork included.

A layer for the ten degrees no one trains for.

Construction

Engineered for the wind that wasn't in the forecast.

Fabric

Moisture-Wicking Performance Fabrics

Print

Heat Transfer, Sublimation, Screen Print, Embroidery

Fit

Athletic & Unisex Fits

Sizes

Youth to 5XL

MOQ

Starting from 1000 Pieces

Lead time

6–8 Weeks Production

Quality

Race-Tested Construction

Features

Details a runner will actually use.

Storm flap

Internal storm flap behind a YKK reverse coil zipper.

Side vents

Mesh-backed pit vents that open without flapping.

Bib pocket

Forearm pocket sized for a folded bib and a key.

Sponsor panels

Engineered into the chest and back, not stuck on top.

Reflective tape

3M Scotchlite at cuffs and rear hem, low-profile.

Articulated elbows

Cut for stride, not for standing still.

Cinch hem

Single-pull adjustable hem from the inside pocket.

Packable

Folds into its own back pocket, fits a bag-drop bin.

Variations

One platform. Every race-day weather.

International triathlon · 2024 · 8 countries

Wind-shell, navy colorway

U.S. road race · 2023 · series

Mid-layer hoodie, slate colorway

Let's make something worth keeping.

view